← Back to map

Galt

Whiteside County, Illinois · EIA plant ID 67636 · Operator: Solar Star Arizona II LLC
SolarSolar PhotovoltaicPJMBA: PJM
Nameplate5MWSummer 5 MW
Generators1in service
Net generation9GWh12 mo to Dec 2025
Capacity factor21%solar units, summer MW
Heat rate—thermal plants only
First online2024

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.250.50.751GWh20242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20242025202620.7% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20241.510.3%—
20259.120.7%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GALTSolar PhotovoltaicPV55Sep 2024Operating—coming soon

Owner / operator

Operator: Solar Star Arizona II LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Solar Star Arizona II LLC100.0%5 MW

Nearby plants

Within 80 km.
Avenue A Generator Sets4 MW6 km
Upper Sterling2 MW6.9 km
Blue Goose Solar CSG2 MW7 km
Industrial Park13 MW7.4 km
SCS Beltway 011754 Rock Falls, LLC1 MW7.8 km
Prophet CSG2 MW7.9 km