← Back to map

Markum Solar Farm

Bosque County, Texas · EIA plant ID 67580 · Operator: Markum Solar Farm, LLC
SolarSolar PhotovoltaicERCOTBA: ERCO
Nameplate161MWSummer 161 MW
Generators1in service
Net generation372GWh12 mo to Aug 2026
Capacity factor26%solar units, summer MW
Heat rate—thermal plants only
First online2024

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
010203040GWh20252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%202420252026202726.4% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202441.817.7%—
2025364.625.9%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
MKMSolar PhotovoltaicPV161161Nov 2024Operating—coming soon

Owner / operator

Operator: Markum Solar Farm, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Markum Solar Farm, LLC100.0%161 MW

Nearby plants

Within 80 km.
Dileo Solar71 MW15.9 km
Lake Whitney Solar—16 km
Bosque County Peaking807 MW18.4 km
BT Hickerson Solar, LLC310 MW19.4 km
Whitney42 MW19.4 km