← Back to map

Donegal Solar ProjectPlanned

Dickens County, Texas · EIA plant ID 67543 · Operator: HE-Cottonwood Solar, LLC
SolarERCOTBA: ERCO

204 MW planned (Solar Photovoltaic), first expected Oct 2028 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
DOGSPSolar PhotovoltaicPV204.2204.2planned Oct 2028Planned—coming soon

Owner / operator

Operator: HE-Cottonwood Solar, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Burksol Energy Storage100 MW1.7 km
Dickens200 MW1.9 km
Roaring Springs, LLC250 MW9.2 km
McAdoo Wind Energy LLC150 MW10 km
Wake Wind Energy Center257 MW21.2 km
Whirlwind Energy Center60 MW40.2 km