Blue Hills Wind ProjectPlanned
Val Verde County, Texas · EIA plant ID 67542 · Operator: Greenalia Wind Power Blue Hills, LLC
276 MW planned (Onshore Wind Turbine), first expected Dec 2029 · EIA-860M
Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—
Capacity factor by year
Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| BHWP | Onshore Wind Turbine | WT | 276 | 276 | planned Dec 2029 | Planned | — | coming soon |
Owner / operator
Operator: Greenalia Wind Power Blue Hills, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Nearby plants
Within 80 km.
| Ranchero Wind Farm LLC | 300 MW | 41.1 km |
| Evans Creek Energy Storage Project | — | 58.3 km |
| Gatsby Energy Storage Project | — | 62.3 km |
| Antlia | 70 MW | 71.8 km |
| White Mesa Wind | 501 MW | 75.8 km |
| Rocksprings | 149 MW | 78.6 km |