← Back to map

Southside SD

Pulaski County, Arkansas · EIA plant ID 67524 · Operator: Entegrity Solar Southside SD, LLC
SolarSolar PhotovoltaicMISOBA: MISO
Nameplate1MWSummer 1 MW
Generators1in service
Net generation2GWh12 mo to Dec 2025
Capacity factor18%solar units, summer MW
Heat rate—thermal plants only
First online2023

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200MWh202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%202320242025202618.4% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202300.0%—
20241.719.1%—
20251.618.4%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
60334Solar PhotovoltaicPV11Jun 2023Operating—coming soon

Owner / operator

Operator: Entegrity Solar Southside SD, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Entegrity Solar Southside SD, LLC100.0%1 MW

Nearby plants

Within 80 km.
NLRED 2MW2 MW2.3 km
NLRED 5MW5 MW2.6 km
Zeuber5 MW3.1 km
City of Little Rock Solar Array—3.4 km
Fourche Creek Wastewater1 MW4.2 km
Two Pine Landfill Gas Recovery5 MW12.6 km