El Dorado AR

Union County, Arkansas · EIA plant ID 67517 · Operator: Entegrity Solar El Dorado SD, LLC
SolarSolar PhotovoltaicMISOBA: MISO
Nameplate2MWSummer 2 MW
Generators1in service
Net generation4GWh12 mo to Dec 2025
Capacity factor23%solar units, summer MW
Heat rate—thermal plants only
First online2024

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200300400MWh20242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20242025202623.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20241.610.9%—
20253.623.1%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
63154Solar PhotovoltaicPV1.81.8Feb 2024Operating—coming soon

Owner / operator

Operator: Entegrity Solar El Dorado SD, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Entegrity Solar El Dorado SD, LLC100.0%2 MW

Nearby plants

Within 80 km.
Union Power Station2,428 MW9.7 km
McClellan (AR)136 MW42.2 km
General Dynamics7 MW43.9 km
SR Camden12 MW47.2 km
Georgia-Pacific Crossett LLC25 MW60.7 km
SAU Tech1 MW63.6 km