West Point RNG
Gooding County, Idaho · EIA plant ID 67436 · Operator: Camco International Group, Inc.
Nameplate3MWSummer 3 MW
Generators2in service
Net generation14GWh12 mo to Dec 2025
Capacity factor49%other units, summer MW
Heat rate—thermal plants only
First online2024
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), other units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2024 | 5.2 | 44.1% | — |
| 2025 | 13.7 | 48.8% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| WPRG | Other Waste Biomass | IC | 1.6 | 1.6 | Aug 2024 | Operating | — | coming soon |
| WPRG1 | Other Waste Biomass | IC | 1.6 | 1.6 | Aug 2024 | Operating | — | coming soon |
Owner / operator
Operator: Camco International Group, Inc.. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Vitol Green Gas LLC | 100.0% | 3 MW |
Nearby plants
Within 80 km.
| Cargill B6 Biofactory | 2 MW | 4.4 km |
| Little Mac Project | 2 MW | 13.4 km |
| Clear Lake | 3 MW | 14.3 km |
| Marco Ranch | 1 MW | 14.5 km |
| Blind Canyon Hydro | 1 MW | 15.5 km |
| Thousand Springs | 7 MW | 15.6 km |