← Back to map

Geer Road Solar 1

Washington County, New York · EIA plant ID 67418 · Operator: aes clean energy
SolarSolar PhotovoltaicNYISOBA: NYIS
Nameplate5MWSummer 5 MW
Generators1in service
Net generation1GWh12 mo to Dec 2025
Capacity factor7%solar units, summer MW
Heat rate—thermal plants only
First online2025

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400MWh2025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%2%4%6%202520267.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20251.47.5%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GEER1Solar PhotovoltaicPV55Aug 2025Operating—coming soon

Owner / operator

Operator: aes clean energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Geer Rd Solar 1 LLC100.0%5 MW

Nearby plants

Within 80 km.
Geer Road Solar 35 MW0.5 km
Geer Road Solar 25 MW0.5 km
Quaker5 MW5.3 km
Wheelabrator Hudson Falls14 MW6 km
Hillview—6.4 km
Hudson Falls Hydroelectric Project44 MW7.1 km