Carvers Creek Solar

Gloucester County, Virginia · EIA plant ID 67342 · Operator: Carvers Creek, LLC
SolarSolar PhotovoltaicPJMBA: PJM
Nameplate154MWSummer 154 MW
Generators2in service
Net generation278GWh12 mo to Aug 2026
Capacity factor25%solar units, summer MW
Heat rate—thermal plants only
First online2024

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0102030GWh20252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%202420252026202724.6% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202434.717.2%—
202522440.4%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
CARVSolar PhotovoltaicPV54.954.9Aug 2024Operating—coming soon
CARV2Solar PhotovoltaicPV9999Dec 2025Operating—coming soon

Owner / operator

Operator: Carvers Creek, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Carvers Creek, LLC100.0%154 MW

Nearby plants

Within 80 km.
Waste Management Middle Peninsula LFGTE6 MW5 km
Puller Solar15 MW12.2 km
WestRock-West Point Mill101 MW17.8 km
King & Queen11 MW18.2 km
Gloucester Solar20 MW18.5 km
Sandale Solar, LLC3 MW21.2 km