SGT Hoskins Solar Project HybridPlanned

Lamar County, Texas · EIA plant ID 67341 · Operator: SGT Hoskins Solar Project, LLC
SolarERCOTBA: ERCO

306 MW planned (Batteries, Solar Photovoltaic), first expected Dec 2027 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
NOSESBatteriesBA102.1102.1planned Dec 2027Planned—coming soon
NOSPVSolar PhotovoltaicPV204.1204.1planned Dec 2027Planned—coming soon

Owner / operator

Operator: SGT Hoskins Solar Project, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Chisum10 MW4.9 km
Echols Grove Solar—11.3 km
Eiffel Solar Project240 MW17.7 km
Delilah Solar Energy II LLC310 MW17.8 km
Impact Solar 1199 MW18.4 km
Paris Energy Center266 MW21.6 km