Washington WS01
Knox County, Maine · EIA plant ID 67339 · Operator: Nautilus Solar Solutions
Nameplate4MWSummer 4 MW
Generators1in service
Net generation5GWh12 mo to Dec 2025
Capacity factor15%solar units, summer MW
Heat rate—thermal plants only
First online2022
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2023 | 5.5 | 15.7% | — |
| 2024 | 5.6 | 16.0% | — |
| 2025 | 5.1 | 14.6% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| SC | Solar Photovoltaic | PV | 4 | 4 | Jun 2022 | Operating | — | coming soon |
Owner / operator
Operator: Nautilus Solar Solutions. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Nautilus Solar Solutions | 100.0% | 4 MW |
Nearby plants
Within 80 km.
| Waldoboro Solar, LLC | 2 MW | 1.4 km |
| North Nobleboro Road, LLC | 3 MW | 12.5 km |
| Warren Meadow Solar Station | — | 14.6 km |
| Maxcy's Mill Solar, LLC | 2 MW | 16.9 km |
| Robbins Lumber | 3 MW | 17.5 km |
| Georges River Energy | 10 MW | 17.5 km |