Gadsden County, Florida · EIA plant ID 67205 · Operator: FRP Gadsden County Solar, LLC
SolarSolar PhotovoltaicBA: FPC
Nameplate75MWSummer 75 MW
Generators1in service
Net generation188GWh12 mo to Aug 2026
Capacity factor29%solar units, summer MW
Heat rate—thermal plants only
First online2024

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
051015GWh20252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%202420252026202728.8% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202424.822.8%—
2025189.229.0%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GADSSolar PhotovoltaicPV74.574.5Nov 2024Operating—coming soon

Owner / operator

Operator: FRP Gadsden County Solar, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
FRP Gadsden County Solar, LLC100.0%75 MW

Nearby plants

Within 80 km.
Wild Azalea Solar Energy Center75 MW2.6 km
Cool Springs Solar (Hybrid)253 MW11 km
J Woodruff44 MW14.5 km
FL Solar D1, LLC4 MW28.3 km
FPL Flowers Creek Solar Energy Center75 MW31.7 km
BE Solar LLC3 MW32.8 km