Amazon SAN3 Solar Project

San Diego County, California · EIA plant ID 67170 · Operator: Solar Star Prime 4 LLC
SolarBatteriesSolar PhotovoltaicCAISOBA: CISO
Nameplate7MWSummer 7 MW
Generators2in service
Net generation8GWh12 mo to Dec 2025
Capacity factor21%solar units, summer MW
Heat rate—thermal plants only
First online2024

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400600800MWh20242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20242025202621.4% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20246.122.9%—
20258.421.4%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
ASBABatteriesBA2.42.4May 2024Operating—coming soon
ASSPSolar PhotovoltaicPV4.64.6May 2024Operating—coming soon

Owner / operator

Operator: Solar Star Prime 4 LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Solar Star Prime 4 LLC100.0%7 MW

Nearby plants

Within 80 km.
Amazon - SAN53 MW0.8 km
Larkspur Energy Facility100 MW1 km
CalPeak Power Border Peaker Plant115 MW1.1 km
Pio Pico Energy Center395 MW1.7 km
Richard J Donovan Correctional Facility3 MW1.9 km
Gateway Energy Storage System250 MW2.2 km