← Back to map

Fillmore County Solar Project

Fillmore County, Minnesota · EIA plant ID 67168 · Operator: Geronimo Energy
SolarSolar PhotovoltaicMISOBA: MISO
Nameplate45MWSummer 45 MW
Generators1in service
Net generation81GWh12 mo to Aug 2026
Capacity factor21%solar units, summer MW
Heat rate—thermal plants only
First online2024

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
02.557.510GWh20252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%202420252026202720.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202425.9%—
20258321.1%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
FILCOSolar PhotovoltaicPV4545Dec 2024Operating—coming soon

Owner / operator

Operator: Geronimo Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Geronimo Energy100.0%45 MW

Nearby plants

Within 80 km.
Saratoga Wind Farm66 MW13 km
Spring Valley7 MW15.3 km
Crane Creek Wind Energy Center99 MW19.6 km
Mower County Wind Energy Center99 MW20.7 km
Grand Meadow (PV)3 MW21.4 km
Pioneer Prairie Wind Farm300 MW22 km