← Back to map

Flat Fork Solar

St. Francis County, Arkansas · EIA plant ID 67076 · Operator: Flat Fork Solar, LLC
SolarSolar PhotovoltaicMISOBA: MISO
Nameplate200MWSummer 200 MW
Generators1in service
Net generation445GWh12 mo to Aug 2026
Capacity factor25%solar units, summer MW
Heat rate—thermal plants only
First online2025

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
02040GWh2026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20252026202725.4% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2025194.526.5%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
FFOR1Solar PhotovoltaicPV200200Aug 2025Operating—coming soon

Owner / operator

Operator: Flat Fork Solar, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Flat Fork Solar, LLC100.0%200 MW

Nearby plants

Within 80 km.
Walnut Bend Solar Station PV100 MW3.2 km
Forrest City- Prison Site1 MW29.2 km
Woodruff Electric Cooperative1 MW30.8 km
SR Forrest City—31.1 km
Forrest City- Eldridge Road1 MW32.1 km
SR Des Arc—39.8 km