Elizabeth Seaport Bldg A Solar
Union County, New Jersey · EIA plant ID 67050 · Operator: Prologis Logistics Services Incorporated
Nameplate2MWSummer 2 MW
Generators1in service
Net generation0GWh12 mo to Dec 2025
Capacity factor4%solar units, summer MW
Heat rate—thermal plants only
First online2022
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2023 | 2 | 15.1% | — |
| 2024 | 2.4 | 18.4% | — |
| 2025 | 0.5 | 3.6% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| NJ701 | Solar Photovoltaic | PV | 1.5 | 1.5 | Jan 2022 | Operating | — | coming soon |
Owner / operator
Operator: Prologis Logistics Services Incorporated. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| ESNJ-PLD-ELIZABETH1, LLC | 100.0% | 2 MW |
Nearby plants
Within 80 km.
| Prologis - SLNNJ036 - Community Solar | — | 0.7 km |
| Allied Beverages Elizabeth | 3 MW | 0.7 km |
| Jersey Gardens Phase 2 | 2 MW | 1 km |
| Jersey Gardens Phase 1 | 2 MW | 1 km |
| Bay Avenue CDG | 3 MW | 1.3 km |
| NJ Airport Solar Project C | 1 MW | 2.7 km |