← Back to map

USS Maverick Solar LLC (CSG)

Blue Earth County, Minnesota · EIA plant ID 66970 · Operator: United States Solar Corporation
SolarSolar PhotovoltaicMISOBA: MISO
Nameplate1MWSummer 1 MW
Generators1in service
Net generation1GWh12 mo to Dec 2025
Capacity factor13%solar units, summer MW
Heat rate—thermal plants only
First online2023

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
050100150MWh202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%5%10%15%202320242025202613.4% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202300.0%—
20241.213.2%—
20251.213.4%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
USMAVSolar PhotovoltaicPV11Dec 2023Operating—coming soon

Owner / operator

Operator: United States Solar Corporation. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
USS Maverick Solar LLC100.0%1 MW

Nearby plants

Within 80 km.
SolarClub 35 LLC1 MW1.9 km
Rapidan Hydro Facility7 MW4.5 km
Archer Daniels Midland Mankato6 MW10.9 km
School Sisters CSG1 MW11.1 km
Wilmarth25 MW11.6 km
Mankato Energy Center741 MW11.7 km