← Back to map

Pine 2 Solar

Beaver County, Pennsylvania · EIA plant ID 66944 · Operator: BE-Pine2 LLC
SolarSolar PhotovoltaicPJMBA: PJM
Nameplate17MWSummer 17 MW
Generators1in service
Net generation29GWh12 mo to Dec 2025
Capacity factor19%solar units, summer MW
Heat rate—thermal plants only
First online2023

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0123GWh202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%202320242025202619.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202313.9%—
202429.719.8%—
202528.519.0%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
2-115Solar PhotovoltaicPV17.117.1Nov 2023Operating—coming soon

Owner / operator

Operator: BE-Pine2 LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
BE-Pine2 LLC100.0%17 MW

Nearby plants

Within 80 km.
Pine 1 Solar17 MW1.1 km
Beaver Valley1,847 MW3.2 km
Montgomery L&D Hydroelectric Project—8.2 km
Shell Chemical Appalachia LLC310 MW12.9 km
Beaver Solar LLC1 MW15 km
New Cumberland Hydroelectric Project—16.3 km