Trumbull Energy Center
Trumbull County, Ohio · EIA plant ID 66918 · Operator: Clean Energy Future - Trumbull, LLC.
Nameplate977MWSummer 900 MW
Generators3in service
Net generation2,414GWh12 mo to Aug 2026
Capacity factor73%gas/coal/oil units, summer MW
Heat rate6,509Btu/kWhfossil units, electric fuel, HHV
First online2026Runs as baseload
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| GT11 | Natural Gas Fired Combined Cycle | CA | 308.7 | 275.6 | Apr 2026 | Operating | — | coming soon |
| GT12 | Natural Gas Fired Combined Cycle | CA | 308.7 | 275.6 | Apr 2026 | Operating | — | coming soon |
| STG | Natural Gas Fired Combined Cycle | CA | 360 | 349.2 | Apr 2026 | Operating | — | coming soon |
Owner / operator
Operator: Clean Energy Future - Trumbull, LLC.. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Clean Energy Future - Trumbull, LLC. | 100.0% | 977 MW |
Nearby plants
Within 80 km.
| Clean Energy Future-Lordstown, LLC | 962 MW | 0.2 km |
| GM Lordstown Assembly Solar Array | retired | 2.6 km |
| ArcelorMittal Warren | 13 MW | 7.7 km |
| Niles RTO BTM | 11 MW | 8.6 km |
| Niles Power Plant | 27 MW | 9 km |
| KSU Trumbull | 1 MW | 14.6 km |