← Back to map

Marlowe Solar

Berkeley County, West Virginia · EIA plant ID 66899 · Operator: Monongahela Power Co
SolarSolar PhotovoltaicPJMBA: PJM
Nameplate6MWSummer 6 MW
Generators1in service
Net generation8GWh12 mo to Dec 2025
Capacity factor20%solar units, summer MW
Heat rate—thermal plants only
First online2025

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.250.50.751GWh2025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2025202620.3% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20257.820.3%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
MARSSolar PhotovoltaicPV5.85.8Apr 2025Operating—coming soon

Owner / operator

Operator: Monongahela Power Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Monongahela Power Co100.0%6 MW

Nearby plants

Within 80 km.
Spruce - WCMD - Rubble I2 MW3.4 km
Spruce - WCMD - Rubble II2 MW3.7 km
Pinesburg Solar LLC4 MW4.5 km
Downsville II—4.8 km
Rockdale2 MW5.5 km
FedEx Hagerstown2 MW6.6 km