Jones City 2 SolarUnder construction

Jones County, Texas · EIA plant ID 66893 · Operator: Lightsource Renewable Energy Asset Management, LLC
BatteryERCOTBA: ERCO

385 MW under construction (Batteries, Solar Photovoltaic), first expected Oct 2026 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service · 385 MW building
Net generation—GWh12 mo
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
TXJC2Solar PhotovoltaicPV185185planned Oct 2026Under construction—coming soon
TXJS2BatteriesBA200200planned Mar 2027Under construction—coming soon

Owner / operator

Operator: Lightsource Renewable Energy Asset Management, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Jones City 1 Solar—2 km
Anson 2 Solar—7 km
ANSON Solar Center, LLC200 MW7.3 km
Tiger Solar—10.5 km
Swenson Solar—21.4 km
Funston Solar—25.5 km