← Back to map

Indigo Solar & StoragePlanned

Fisher County, Texas · EIA plant ID 66891 · Operator: GGS Energy LLC
BatteryERCOTBA: ERCO

330 MW planned (Batteries, Solar Photovoltaic), first expected May 2027 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
245BSBatteriesBA180180planned May 2027Planned—coming soon
IS245Solar PhotovoltaicPV150150planned May 2027Planned—coming soon

Owner / operator

Operator: GGS Energy LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Leuven Solar LLC—15 km
Hecate Energy Harley Hand Solar LLC—17.8 km
Trent Wind Farm LP152 MW22 km
South Trent Wind Farm101 MW26.4 km
Sweetwater BESS10 MW27.2 km
Jones City 1 Solar—27.4 km