← Back to map

Cenergy - Pulk

Androscoggin County, Maine · EIA plant ID 66874 · Operator: BAP Grounded 2 LLC
SolarSolar PhotovoltaicISONEBA: ISNE
Nameplate5MWSummer 5 MW
Generators1in service
Net generation8GWh12 mo to Dec 2025
Capacity factor17%solar units, summer MW
Heat rate—thermal plants only
First online2024

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.250.50.751GWh2025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%5%10%15%2025202617.3% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20257.617.3%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
PULSolar PhotovoltaicPV55Dec 2024Operating—coming soon

Owner / operator

Operator: BAP Grounded 2 LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
BAP Grounded 2 LLC100.0%5 MW

Nearby plants

Within 80 km.
Crowley Solar, LLC2 MW3.5 km
MD - EDFR - Phase II - Lewiston5 MW4.3 km
Sabattus SB015 MW4.7 km
Lisbon Street Solar2 MW6.2 km
Androscoggin 3retired7.9 km
Deer Rips7 MW8 km