← Back to map

Lycan Solar ProjectPlanned

Riverside County, California · EIA plant ID 66805 · Operator: edf renewables development, inc.
BatteryCAISOBA: CISO

800 MW planned (Batteries, Solar Photovoltaic), first expected Dec 2027 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
LYCANSolar PhotovoltaicPV400400planned Dec 2027Planned—coming soon
LYCN2BatteriesBA400400planned Apr 2030Planned—coming soon

Owner / operator

Operator: edf renewables development, inc.. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Genesis Solar Energy Project250 MW10.3 km
Chuckawalla Solar4 MW17.5 km
SunEdison Ironwood State Prison1 MW17.5 km
Ironwood Solar LLC4 MW17.6 km
Chuckawalla Valley State Prison1 MW18.9 km