← Back to map

Millers Chapel Solar

Wayne County, North Carolina · EIA plant ID 66719 · Operator: SunStrong Management
SolarSolar PhotovoltaicBA: CPLE
Nameplate5MWSummer 5 MW
Generators1in service
Net generation8GWh12 mo to Dec 2025
Capacity factor19%solar units, summer MW
Heat rate—thermal plants only
First online2021

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.250.50.751GWh2022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2022202320242025202618.9% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20229.322.1%—
20239.723.2%—
20249.823.2%—
2025818.9%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
MILCHSolar PhotovoltaicPV4.84.8Dec 2021Operating—coming soon

Owner / operator

Operator: SunStrong Management. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
SunStrong Management100.0%5 MW

Nearby plants

Within 80 km.
Jester Solar5 MW1.1 km
Wayne Solar III LLC5 MW4.7 km
Wedge5 MW6.5 km
Ramp Solar, LLC2 MW6.5 km
Moorings Farm5 MW8.7 km
Moorings Farm 2, LLC5 MW8.7 km