Eunice LA Plant
Acadia County, Louisiana · EIA plant ID 66615 · Operator: EnLink Processing Services, LLC
Nameplate5MWSummer 4 MW
Generators1in service
Net generation-4GWh12 mo to Dec 2025
Capacity factor-12%!gas/coal/oil units, summer MW
Heat rate—thermal plants only
First online2024Runs as rarely runs
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2024 | -2.2 | -17.5% | — |
| 2025 | -4.3 | -11.6% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| STG01 | Natural Gas Steam Turbine | ST | 4.7 | 4.2 | Sep 2024 | Operating | — | coming soon |
Owner / operator
Operator: EnLink Processing Services, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| EnLink Processing Services, LLC | 100.0% | 5 MW |
Nearby plants
Within 80 km.
| Acadia Energy Center | 1,389 MW | 12 km |
| Mowata Solar | — | 14.5 km |
| Bayou Cove Peaking Power | 416 MW | 20.9 km |
| Rayne | 8 MW | 35.4 km |
| Prairie Ronde Solar Farm | 135 MW | 38.4 km |
| SR Sunset | — | 44 km |