Sunlight Storage II
Riverside County, California · EIA plant ID 66575 · Operator: Sunlight Storage II
Nameplate230MWSummer 230 MW
Generators1in service
Net generation-51GWh12 mo to Aug 2026
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online2024
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2024 | -52.8 | — | — |
| 2025 | -48.4 | — | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| SUNS2 | Batteries | BA | 230 | 230 | Apr 2024 | Operating | — | coming soon |
Owner / operator
Operator: Sunlight Storage II. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Sunlight Storage II | 100.0% | 230 MW |
Nearby plants
Within 80 km.
| Colgreen North Shore Solar Farm | 75 MW | 34.3 km |
| Sunlight Storage | 230 MW | 36.2 km |
| Desert View Power | retired | 36.8 km |
| Desert Sunlight 250, LLC | 250 MW | 36.9 km |
| Desert Sunlight 300, LLC | 314 MW | 37 km |
| Coachella | 92 MW | 37.9 km |