Cicero Energy Storage 1 LLC
Onondaga County, New York · EIA plant ID 66501 · Operator: Convergent Energy and Power LP
Nameplate10MWSummer 10 MW
Generators2in service
Net generation7GWh12 mo to Dec 2025
Capacity factor16%solar units, summer MW
Heat rate—thermal plants only
First online2022
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2022 | 4.1 | 11.1% | — |
| 2023 | 7.4 | 17.0% | — |
| 2024 | 7 | 15.8% | — |
| 2025 | 6.9 | 15.8% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| CCBA1 | Batteries | BA | 5 | 5 | Mar 2022 | Operating | — | coming soon |
| CCPV1 | Solar Photovoltaic | PV | 5 | 5 | Mar 2022 | Operating | — | coming soon |
Owner / operator
Operator: Convergent Energy and Power LP. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Convergent Energy and Power LP | 100.0% | 10 MW |
Nearby plants
Within 80 km.
| Cicero Energy Storage 2 LLC | 10 MW | 0.5 km |
| Onondaga County - Oak Orchard WWTP | 2 MW | 4.5 km |
| Source Power II - Taft CSG | 4 MW | 4.6 km |
| Summit - Cicero | 5 MW | 6.4 km |
| Bartell South PV I | — | 7.4 km |
| Ver Plank South (CSG) | 5 MW | 8.9 km |