G W Ivey

Miami-Dade County, Florida · EIA plant ID 665 · Operator: City of Homestead - (FL)
Natural gasNatural Gas Internal Combustion EnginePetroleum LiquidsBA: HST
Nameplate36MWSummer 33 MW
Generators11in service
Net generation-4GWh12 mo to Dec 2025
Capacity factor-2%!gas/coal/oil units, summer MW
Heat rate—Btu/kWhfossil units, electric fuel, HHV
First online1970Runs as rarely runs

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-505101520GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%5%10%20052010201520202025-1.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
5,00010,00015,00020,000200520102015
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
200138.27.5%11,625
200256.812.3%10,719
200354.111.8%9,706
200438.78.4%11,262
200542.99.3%11,348
200652.911.5%10,036
200736.98.0%11,982
200813.12.8%11,907
200939.28.5%13,187
201025.75.6%11,930
201116.13.5%15,432
201216.43.6%15,176
201316.84.9%14,891
201414.25.0%15,632
20156.12.1%16,273
20165.51.9%16,915
20170.70.2%21,419
2018-0.8-0.3%—
2019-0.5-0.2%—
2020-0.4-0.1%—
2021-0.7-0.2%—
2022-2.1-0.7%—
2023-4-1.4%—
2024-3.3-1.1%—
2025-4.3-1.5%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
13Natural Gas Internal Combustion EngineIC21.8Nov 1972Operating—coming soon
14Natural Gas Internal Combustion EngineIC21.8Nov 1972Operating—coming soon
15Natural Gas Internal Combustion EngineIC21.8Nov 1972Operating—coming soon
16Natural Gas Internal Combustion EngineIC21.8Nov 1972Operating—coming soon
17Natural Gas Internal Combustion EngineIC21.8Nov 1972Operating—coming soon
19Natural Gas Internal Combustion EngineIC8.88Feb 1975Operating—coming soon
2Natural Gas Internal Combustion EngineIC21.8Mar 1970Operating—coming soon
20Natural Gas Internal Combustion EngineIC6.46May 1981Operating—coming soon
21Natural Gas Internal Combustion EngineIC6.46May 1981Operating—coming soon
22Petroleum LiquidsIC0.10.1Jan 2013Operating (Standby / backup)—coming soon
3Petroleum LiquidsIC21.8Mar 1970Operating—coming soon
10Natural Gas Internal Combustion EngineIC2.52Jan 1958Retired May 2013—coming soon
11Natural Gas Internal Combustion EngineIC3.23Jan 1965Retired May 2013—coming soon
12Natural Gas Internal Combustion EngineIC3.23Jan 1965Retired May 2013—coming soon
18Natural Gas Internal Combustion EngineIC8.88Apr 1975Retired May 2013—coming soon
8Natural Gas Internal Combustion EngineIC2.52Jan 1954Retired May 2013—coming soon
9Natural Gas Internal Combustion EngineIC2.52Jan 1958Retired May 2013—coming soon

Owner / operator

Operator: City of Homestead - (FL). Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
City of Homestead - (FL)100.0%36 MW

Nearby plants

Within 80 km.
Redlands75 MW10.7 km
Everglades Solar Energy Center75 MW11.3 km
Turkey Point2,978 MW14.7 km
South District Wastewater Treatment Plt8 MW15.8 km
Miami Dade Solar Energy Center75 MW18.4 km
FIU Solar1 MW34.3 km