Anheuser Busch - Fairfield
Solano County, California · EIA plant ID 66456 · Operator: Bloom Energy
Nameplate3MWSummer 3 MW
Generators1in service
Net generation21GWh12 mo to Dec 2025
Capacity factor92%gas/coal/oil units, summer MW
Heat rate7,013Btu/kWhfossil units, electric fuel, HHV
First online2022Runs as baseload
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2022 | 0.7 | 36.9% | 6,157 |
| 2023 | 21.6 | 94.8% | 6,419 |
| 2024 | 21.3 | 93.2% | 6,795 |
| 2025 | 20.9 | 91.9% | 7,013 |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| ANB00 | Other Natural Gas | FC | 2.6 | 2.6 | Dec 2022 | Operating | — | coming soon |
Owner / operator
Operator: Bloom Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Bloom Energy | 100.0% | 3 MW |
Nearby plants
Within 80 km.
| Anheuser-Busch #2 | 2 MW | 0.2 km |
| Foundation AB | 2 MW | 0.3 km |
| SunEdison Anheuser Busch Fairfield | 1 MW | 0.3 km |
| ATT North Watney | 2 MW | 1.3 km |
| Wolfskill Energy Center | 48 MW | 1.7 km |
| Solano County Cogen Plant | 3 MW | 4.9 km |