Anheuser Busch - Fairfield

Solano County, California · EIA plant ID 66456 · Operator: Bloom Energy
Natural gasOther Natural GasCAISOBA: CISO
Nameplate3MWSummer 3 MW
Generators1in service
Net generation21GWh12 mo to Dec 2025
Capacity factor92%gas/coal/oil units, summer MW
Heat rate7,013Btu/kWhfossil units, electric fuel, HHV
First online2022Runs as baseload

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.511.52GWh202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%50%100%2022202320242025202691.9% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
6,0006,5007,000202220232024202520267,013 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20220.736.9%6,157
202321.694.8%6,419
202421.393.2%6,795
202520.991.9%7,013

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
ANB00Other Natural GasFC2.62.6Dec 2022Operating—coming soon

Owner / operator

Operator: Bloom Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Bloom Energy100.0%3 MW

Nearby plants

Within 80 km.
Anheuser-Busch #22 MW0.2 km
Foundation AB2 MW0.3 km
SunEdison Anheuser Busch Fairfield1 MW0.3 km
ATT North Watney2 MW1.3 km
Wolfskill Energy Center48 MW1.7 km
Solano County Cogen Plant3 MW4.9 km