← Back to map

Emerald Gardens PKI, LLC

Fairfield County, Connecticut · EIA plant ID 66429 · Operator: Emerald Gardens PKI, LLC
SolarSolar PhotovoltaicISONEBA: ISNE
Nameplate2MWSummer 2 MW
Generators2in service
Net generation2GWh12 mo to Dec 2025
Capacity factor14%solar units, summer MW
Heat rate—thermal plants only
First online2021

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200300MWh2022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2022202320242025202614.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20222.719.4%—
20232.215.6%—
20242.115.1%—
2025214.5%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
EPKI1Solar PhotovoltaicPV0.80.8Oct 2021Operating—coming soon
EPKI2Solar PhotovoltaicPV0.80.8Oct 2021Operating—coming soon

Owner / operator

Operator: Emerald Gardens PKI, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
EG1 PKI Holdings, LLC100.0%2 MW

Nearby plants

Within 80 km.
Sikorsky Aircraft CHP10 MW3.1 km
Digital Fairfieldretired4 km
Milford Power Project578 MW5.6 km
Derby Hydro9 MW6.1 km
Derby Fuel Cell14 MW6.2 km
GenConn Devon LLC242 MW6.9 km