← Back to map

BPL Files Solar

Hill County, Texas · EIA plant ID 66324 · Operator: BPL Files Solar LLC
SolarSolar PhotovoltaicERCOTBA: ERCO
Nameplate158MWSummer 145 MW
Generators1in service
Net generation237GWh12 mo to Aug 2026
Capacity factor19%solar units, summer MW
Heat rate—thermal plants only
First online2023

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0102030GWh202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%2023202420252026202718.7% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2023226.242.5%—
2024280.122.0%—
2025224.717.7%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
FILESSolar PhotovoltaicPV157.5145Aug 2023Operating—coming soon

Owner / operator

Operator: BPL Files Solar LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
BPL Files Solar LLC100.0%158 MW

Nearby plants

Within 80 km.
Hill Solar 1—5.1 km
Hill Solar II—7.7 km
Edens Solar—13.9 km
Oystercatcher Solar—14.4 km
Hillsboro Solar Project—18.5 km
Three W Solar111 MW21.6 km