Madison Solar (VA)

Orange County, Virginia · EIA plant ID 66316 · Operator: aes clean energy
SolarSolar PhotovoltaicPJMBA: PJM
Nameplate63MWSummer 63 MW
Generators1in service
Net generation125GWh12 mo to Aug 2026
Capacity factor23%solar units, summer MW
Heat rate—thermal plants only
First online2024

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
051015GWh20252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%202420252026202722.9% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202421.711.9%—
2025119.121.8%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
MDSOSolar PhotovoltaicPV62.562.5Sep 2024Operating—coming soon

Owner / operator

Operator: aes clean energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
aes clean energy100.0%63 MW

Nearby plants

Within 80 km.
Highlander Solar Energy Station 1165 MW6.5 km
Richmond Spider Solar20 MW6.5 km
Pleinmont Solar 2240 MW6.5 km
Pleinmont Solar 175 MW6.5 km
Greenwood Solar I—16.6 km
Electric Avenue Facility7 MW21.8 km