Courthouse SolarUnder construction
Charlotte County, Virginia · EIA plant ID 66312 · Operator: Dominion Energy Inc
167 MW under construction (Solar Photovoltaic), first expected Oct 2030 · EIA-860M
Nameplate—MWSummer — MW
Generators0in service · 167 MW building
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—
Capacity factor by year
Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| CHSL | Solar Photovoltaic | PV | 167 | 167 | planned Oct 2030 | Under construction | — | coming soon |
Owner / operator
Operator: Dominion Energy Inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Nearby plants
Within 80 km.
| Twittys Creek Solar, LLC | 14 MW | 2.4 km |
| Clover | 848 MW | 22 km |
| Prince Edward CSG LLC | 4 MW | 22.8 km |
| Foxhound | 83 MW | 23.2 km |
| Grasshopper Solar | 80 MW | 24.1 km |
| HCE Red House Solar, LLC | 5 MW | 26.2 km |