Landau II Solar (Hybrid)
Ulster County, New York · EIA plant ID 66222 · Operator: Generate Capital
Nameplate8MWSummer 8 MW
Generators2in service
Net generation5GWh12 mo to Dec 2025
Capacity factor13%solar units, summer MW
Heat rate—thermal plants only
First online2021
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2022 | 3.9 | 11.1% | — |
| 2023 | 5.1 | 14.5% | — |
| 2024 | 3.5 | 10.1% | — |
| 2025 | 4.6 | 13.2% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 10895 | Solar Photovoltaic | PV | 4 | 4 | Dec 2021 | Operating | — | coming soon |
| BAT | Batteries | BA | 4 | 4 | Dec 2021 | Operating | — | coming soon |
Owner / operator
Operator: Generate Capital. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Generate NY Community Solar Lessor III | 100.0% | 8 MW |
Nearby plants
Within 80 km.
| Landau Solar | 2 MW | 0.3 km |
| New Beginnings Solar | 2 MW | 5.8 km |
| Sturgeon | 14 MW | 6.1 km |
| CES Marbletown Solar | 3 MW | 6.7 km |
| Ulster County Solar | 1 MW | 7.7 km |
| 700 Binnewater | 1 MW | 7.9 km |