Canoga Solar
Seneca County, New York · EIA plant ID 66212 · Operator: Generate Capital
Nameplate5MWSummer 5 MW
Generators1in service
Net generation5GWh12 mo to Dec 2025
Capacity factor11%solar units, summer MW
Heat rate—thermal plants only
First online2021
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2022 | 8.5 | 19.5% | — |
| 2023 | 8.2 | 18.6% | — |
| 2024 | 8.2 | 18.7% | — |
| 2025 | 5 | 11.4% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 10965 | Solar Photovoltaic | PV | 5 | 5 | Jul 2021 | Operating | — | coming soon |
Owner / operator
Operator: Generate Capital. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Generate NY Community Solar Lessor III | 100.0% | 5 MW |
Nearby plants
Within 80 km.
| Seneca Falls Hydroelectric Project | 5 MW | 7.1 km |
| Waterloo Hydroelectric Project | 2 MW | 7.5 km |
| Seneca Energy | 18 MW | 9.1 km |
| Spring Street Road | 5 MW | 10.1 km |
| Donati Solar | 2 MW | 10.3 km |
| Sangolqui Solar | 2 MW | 10.7 km |