Caribbean Medical Center
Puerto Rico · EIA plant ID 66092 · Operator: Hospital Caribbean Medical Center
Nameplate2MWSummer 1 MW
Generators5in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online2001
Capacity factor by year
Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 1 | Petroleum Liquids | IC | 0.5 | 0.3 | Jul 2018 | Operating (Standby / backup) | — | coming soon |
| 2 | Petroleum Liquids | IC | 0.4 | 0.3 | Jul 2018 | Operating (Standby / backup) | — | coming soon |
| 3 | Petroleum Liquids | IC | 0.5 | 0.3 | Nov 2001 | Operating (Standby / backup) | — | coming soon |
| 4 | Petroleum Liquids | IC | 0.5 | 0.3 | Nov 2001 | Operating (Standby / backup) | — | coming soon |
| OPD1 | Petroleum Liquids | IC | 0.2 | 0.1 | Jul 2018 | Operating (Standby / backup) | — | coming soon |
Owner / operator
Operator: Hospital Caribbean Medical Center. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Hospital Caribbean Medical Center | 100.0% | 2 MW |
Nearby plants
Within 80 km.
| HIMA San Pablo Fajardo | 3 MW | 0.7 km |
| Fajardo MSWL | 2 MW | 5.4 km |
| Daguao | 42 MW | 10.8 km |
| Punta Lima Wind Farm | 26 MW | 16.5 km |
| Rio Blanco | 5 MW | 16.8 km |
| El Yunque Filtration Plant | 2 MW | 18.4 km |