Putah Creek Solar Farm North
Yolo County, California · EIA plant ID 66088 · Operator: Putah Creek Solar Farms LLC
Nameplate3MWSummer 3 MW
Generators1in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online2022
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2022 | 5.2 | 81.6% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| PCEF | Solar Photovoltaic | PV | 3 | 2.9 | Oct 2022 | Operating | — | coming soon |
Owner / operator
Operator: Putah Creek Solar Farms LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Putah Creek Solar Farms LLC | 100.0% | 3 MW |
Nearby plants
Within 80 km.
| Putah Creek Solar Farm | 2 MW | 0.4 km |
| Monticello Dam | 12 MW | 9.6 km |
| Vaca Dixon Solar Station | 2 MW | 14 km |
| Mariani Packing Vacaville Solar | 1 MW | 14.1 km |
| Vacaville | 1 MW | 14.2 km |
| CalPeak Power Vaca Dixon Peaker Plant | 61 MW | 15.3 km |