← Back to map

AES Waiawa Phase 2 SolarUnder construction

Honolulu County, Hawaii · EIA plant ID 66066 · Operator: AES Distributed Energy
BatteryBA: HECO

60 MW under construction (Batteries, Solar Photovoltaic), first expected Oct 2026 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service · 60 MW building
Net generation—GWh12 mo
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
WAIBABatteriesBA3030planned Oct 2026Under construction—coming soon
WAIPVSolar PhotovoltaicPV3030planned Oct 2026Under construction—coming soon

Owner / operator

Operator: AES Distributed Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Waiawa Solar Power Hybrid72 MW1.4 km
Waipio Solar46 MW2.9 km
Lanikuhana Solar LLC15 MW4.7 km
Waiau375 MW4.9 km
Waihonu North Solar5 MW5.8 km
Ho'Ohana Solar 1117 MW5.8 km