Brazoria County Solar Project (Danciger)

Brazoria County, Texas · EIA plant ID 66046 · Operator: Brazoria County Solar Project
SolarSolar PhotovoltaicERCOTBA: ERCO
Nameplate200MWSummer 200 MW
Generators1in service
Net generation390GWh12 mo to Aug 2026
Capacity factor22%solar units, summer MW
Heat rate—thermal plants only
First online2022

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
02040GWh2023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20222023202420252026202722.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202265.17.4%—
2023433.224.7%—
2024387.422.1%—
2025422.924.1%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
BRZ01Solar PhotovoltaicPV200200Jul 2022Operating—coming soon

Owner / operator

Operator: Brazoria County Solar Project. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Brazoria County Solar Project100.0%200 MW

Nearby plants

Within 80 km.
Second Division Solar100 MW2.1 km
Brazoria West200 MW9.6 km
TX23 Roughneck Storage50 MW9.8 km
Bell Creek BESS LLC—10.1 km
Elio Energy LLC—10.7 km
Long Point Solar120 MW11.1 km