Wolfskin Solar
Oglethorpe County, Georgia · EIA plant ID 66027 · Operator: Wolfskin Solar, LLC
Nameplate38MWSummer 38 MW
Generators1in service
Net generation84GWh12 mo to Aug 2026
Capacity factor25%solar units, summer MW
Heat rate—thermal plants only
First online2024
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2024 | 4.2 | 14.7% | — |
| 2025 | 80.6 | 24.2% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| GA-04 | Solar Photovoltaic | PV | 38 | 38 | Dec 2024 | Operating | — | coming soon |
Owner / operator
Operator: Wolfskin Solar, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Wolfskin Solar, LLC | 100.0% | 38 MW |
Nearby plants
Within 80 km.
| CII Methane Management III LFG Plant | 2 MW | 5.2 km |
| Athens Regional Medical Center | 5 MW | 16.6 km |
| GRP Madison Renewable Energy Facility | 58 MW | 18.4 km |
| Dahlberg | 919 MW | 22.7 km |
| High Shoals Hydro (GA) | 1 MW | 24.9 km |
| Comer Solar | 2 MW | 25.5 km |