Oglethorpe County, Georgia · EIA plant ID 66027 · Operator: Wolfskin Solar, LLC
SolarSolar PhotovoltaicBA: SOCO
Nameplate38MWSummer 38 MW
Generators1in service
Net generation84GWh12 mo to Aug 2026
Capacity factor25%solar units, summer MW
Heat rate—thermal plants only
First online2024

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
02468GWh20252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%202420252026202725.3% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20244.214.7%—
202580.624.2%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GA-04Solar PhotovoltaicPV3838Dec 2024Operating—coming soon

Owner / operator

Operator: Wolfskin Solar, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Wolfskin Solar, LLC100.0%38 MW

Nearby plants

Within 80 km.
CII Methane Management III LFG Plant2 MW5.2 km
Athens Regional Medical Center5 MW16.6 km
GRP Madison Renewable Energy Facility58 MW18.4 km
Dahlberg919 MW22.7 km
High Shoals Hydro (GA)1 MW24.9 km
Comer Solar2 MW25.5 km