USS Wolf Solar LLC
Yellow Medicine County, Minnesota · EIA plant ID 65992 · Operator: United States Solar Corporation
Nameplate1MWSummer 1 MW
Generators1in service
Net generation2GWh12 mo to Dec 2025
Capacity factor25%solar units, summer MW
Heat rate—thermal plants only
First online2023
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2023 | 1.1 | 24.5% | — |
| 2024 | 2.2 | 24.5% | — |
| 2025 | 2.2 | 24.8% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| USWOF | Solar Photovoltaic | PV | 1 | 1 | Jul 2023 | Operating | — | coming soon |
Owner / operator
Operator: United States Solar Corporation. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| USS Wolf Solar LLC | 100.0% | 1 MW |
Nearby plants
Within 80 km.
| Novel Shelly Solar LLC (CSG) | 1 MW | 3.5 km |
| Marshall Solar Energy Project | 62 MW | 16.5 km |
| Lantana Solar, LLC | 1 MW | 19.3 km |
| MN CSG 2019-79 | 1 MW | 20.8 km |
| Novel Milbradt Solar LLC | 1 MW | 20.9 km |
| Granite Falls 2 | 6 MW | 21.3 km |