← Back to map

Peregrine Solar

Goliad County, Texas · EIA plant ID 65979 · Operator: RWE Clean Energy
SolarSolar PhotovoltaicERCOTBA: ERCO
Nameplate300MWSummer 300 MW
Generators1in service
Net generation720GWh12 mo to Aug 2026
Capacity factor27%solar units, summer MW
Heat rate—thermal plants only
First online2025

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
020406080GWh20252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20252026202727.4% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2025692.528.8%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
PSPVSolar PhotovoltaicPV300300Feb 2025Operating—coming soon

Owner / operator

Operator: RWE Clean Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
RWE Clean Energy100.0%300 MW

Nearby plants

Within 80 km.
Myers Solar and Storage—24.9 km
Blackjack Creek Wind Farm240 MW25.4 km
Cranell Wind Farm LLC220 MW25.6 km
Ray Ranch Solar—34.5 km
Coleto Creek622 MW39.4 km
Abeja Solar Farm—40.8 km