Wood County, Ohio · EIA plant ID 65951 · Operator: VESI 21 LLC
BatteryBatteriesPJMBA: PJM
Nameplate12MWSummer 12 MW
Generators1in service
Net generation-2GWh12 mo to Dec 2025
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online2023

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-250-200-150-100-500MWh20242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2024-2.6——
2025-2.3——

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
BG1BatteriesBA1212May 2023Operating—coming soon

Owner / operator

Operator: VESI 21 LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
VESI 21 LLC100.0%12 MW

Nearby plants

Within 80 km.
Bowling Green Peaking32 MW2.5 km
DG AMP Solar Bowling Green20 MW2.9 km
Bowling Green Generating Station50 MW3 km
Bowling Green Windretired10.6 km
Troy Energy LLC796 MW16.4 km
Juliet Energy Project, LLC—17.6 km