Grand Casino Hinckley Solar

Pine County, Minnesota · EIA plant ID 65942 · Operator: DG Central 1, LLC
SolarSolar PhotovoltaicMISOBA: MISO
Nameplate3MWSummer 3 MW
Generators1in service
Net generation6GWh12 mo to Dec 2025
Capacity factor21%solar units, summer MW
Heat rate—thermal plants only
First online2022

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400600MWh202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2022202320242025202621.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20223.620.6%—
20235.822.1%—
20245.621.4%—
20255.521.0%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GRANDSolar PhotovoltaicPV33May 2022Operating—coming soon

Owner / operator

Operator: DG Central 1, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
DG Central 1, LLC100.0%3 MW

Nearby plants

Within 80 km.
Rock Lake CT25 MW22.9 km
Clam River Dam1 MW29.3 km
Grantsburg Diesel6 MW30.9 km
Mora14 MW33.2 km
Falun—38.6 km
SMMPA Methane Energy Facility2 MW38.8 km