← Back to map

Shasta College PH2 Solar Project

Shasta County, California · EIA plant ID 65940 · Operator: TotalEnergies Distributed Generation, LLC
SolarBatteriesSolar PhotovoltaicCAISOBA: CISO
Nameplate2MWSummer 2 MW
Generators2in service
Net generation—GWh12 mo
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online2026

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.20.40.60.81MWh2022

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20220——

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
SCSP1Solar PhotovoltaicPV1.51.3Jan 2026Operating—coming soon
SCSPBBatteriesBA0.50.5Jan 2026Operating—coming soon

Owner / operator

Operator: TotalEnergies Distributed Generation, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Shasta College100.0%2 MW

Nearby plants

Within 80 km.
Keswick117 MW11.3 km
Spring Creek180 MW13 km
Shasta714 MW13.7 km
Redding Power183 MW16 km
SPI Anderson 230 MW17 km
Whiskeytown4 MW19.2 km