← Back to map

Tenmile Creek

Calhoun County, Florida · EIA plant ID 65886 · Operator: Florida Power & Light Co
SolarBatteriesSolar PhotovoltaicBA: FPL
Nameplate149MWSummer 149 MW
Generators2in service
Net generation170GWh12 mo to Aug 2026
Capacity factor27%solar units, summer MW
Heat rate—thermal plants only
First online2025

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
05101520GWh20252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20252026202727.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2025182.127.9%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Solar PhotovoltaicPV74.574.5Jan 2025Operating—coming soon
2BatteriesBA74.574.5Dec 2025Operating—coming soon

Owner / operator

Operator: Florida Power & Light Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Florida Power & Light Co100.0%149 MW

Nearby plants

Within 80 km.
Pinecone—11 km
Saddle—11 km
Sand Pine75 MW11.1 km
Big Brook75 MW11.3 km
FPL Chipola River Solar Energy Center149 MW12 km
Fourmile Creek149 MW12.6 km