← Back to map

Middlebrook Creek Solar and BESSUnder construction

Nacogdoches County, Texas · EIA plant ID 65853 · Operator: Parliament Energy Holdings LLC
SolarERCOTBA: ERCO

371 MW under construction · 303 MW planned (Batteries, Solar Photovoltaic), first expected Apr 2027 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service · 371 MW building
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
MIDPVSolar PhotovoltaicPV371371planned Jun 2028Under construction—coming soon
MIDBSBatteriesBA302.9302.9planned Apr 2027Planned—coming soon

Owner / operator

Operator: Parliament Energy Holdings LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Azalea Springs Solar Park180 MW18.5 km
Sun Angel ESS—26.1 km
Lufkin South BESS10 MW30 km
Nacogdoches Power114 MW32.5 km
Diboll BESS10 MW40.2 km
Stryker Creek713 MW46.7 km