Fruitland Creek Solar (CSG)

Marion County, Oregon · EIA plant ID 65747 · Operator: Fruitland Creek Solar, LLC
SolarSolar PhotovoltaicBA: PGE
Nameplate2MWSummer 2 MW
Generators1in service
Net generation3GWh12 mo to Dec 2025
Capacity factor17%solar units, summer MW
Heat rate—thermal plants only
First online2022

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200300MWh202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%5%10%15%2022202320242025202616.7% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20220.14.3%—
20232.415.4%—
20242.515.6%—
20252.616.7%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
FC22Solar PhotovoltaicPV1.81.8Dec 2022Operating—coming soon

Owner / operator

Operator: Fruitland Creek Solar, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Fruitland Creek Solar, LLC100.0%2 MW

Nearby plants

Within 80 km.
Bighorn Solar2 MW4.2 km
Salem Henningsen2 MW5.2 km
GreenparkSolar1 MW5.6 km
SSD Marion 3, LLC2 MW6.1 km
Salem Smart Power Centerretired6.4 km
Rafael Solar2 MW9.6 km