← Back to map

Canal Energy S23, LLC

Kings County, California · EIA plant ID 65740 · Operator: Headwater Energy, LLC
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate4MWSummer 4 MW
Generators1in service
Net generation10GWh12 mo to Dec 2025
Capacity factor28%solar units, summer MW
Heat rate—thermal plants only
First online2021

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.250.50.751GWh2022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%20212022202320242025202628.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202100.0%—
20227.721.4%—
20237.220.2%—
20247.922.0%—
20251028.0%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
21536Solar PhotovoltaicPV4.14.1Dec 2021Operating—coming soon

Owner / operator

Operator: Headwater Energy, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
CRE Fund 2, LLC100.0%4 MW

Nearby plants

Within 80 km.
Corcoran Solar 320 MW3.6 km
CID Solar (CA)2 MW4 km
Corcoran Irrigation District Floating So3 MW4.2 km
CID Solar, LLC20 MW4.2 km
Corcoran Solar 220 MW4.3 km
Corcoran Solar20 MW4.4 km